    The same cubic meter of CLT can yield very different results in an LCA, depending on what is assumed to happen to it after demolition.

    Each EPD proposes its own end-of-life scenario, which may not match what is actually planned for the building. Anyone comparing products or building systems without examining the scenarios assumed by the supplier risks comparing the data incorrectly.

    End-of-life scenarios in fact carry significant weight when analyzing CLT across phases A1-D.

    To understand how much weight they carry, we analyzed twelve EPDs from eleven European CLT manufacturers, all compliant with EN 15804+A2.

    The end-of-life modules

    ModuleWhat it includes
    C1Deconstruction or demolition
    C2Transport to waste treatment
    C3Treatment for reuse, recycling or energy recovery; this is where biogenic carbon exits the system
    C4Final disposal, for example landfill
    DBenefits and loads beyond the system boundary: material and energy that replace other sources; must always be reported separately

    What European CLT manufacturers’ EPDs declare

    The first finding: the main scenario is almost always the same. In the vast majority of EPDs, end-of-life CLT is incinerated with energy recovery, at 95-100%.

    Only a few manufacturers use a mix including shares of recycling and reuse. The clearest case is Derix, which declares an EPD for panels sold under a take-back contract: 60% is reused and only 34% incinerated.

    The second important aspect to analyze is how much the entire life cycle of the panel weighs, in terms of fossil emissions: from production to demolition.

    The chart sums the production modules (A1-A3) and the end-of-life modules (C1-C4).

    End-of-life_CLT_overall_cycle_A1-C3

    From production to demolition, 1 m³ of CLT emits between 52 and 137 kg of fossil CO₂, depending on the manufacturer.

    The end-of-life share ranges from a few kilograms to over 30: here too, the assumptions each EPD makes about the treatment plant have a significant effect.

    Same CLT, different end-of-life

    Some EPDs declare, in addition to the main scenario (incineration), alternative scenarios such as recycling, reuse or transport to landfill.

    The environmental impact related to the product and production stages is identical, while the process following demolition changes.

    CLT_end-of-life_scenarios

    The same comparison appears in KLH’s EPD: with incineration, CLT is worth 109 kg CO₂e/m³ without module D and −153 with module D; with reuse, 90 and +13.

    Three things emerge.

    1. Landfill is by far the worst scenario. Timber that decomposes in the absence of oxygen produces methane, a greenhouse gas more potent than CO₂. In Stora Enso’s EPD, the biogenic carbon released in landfill amounts to 1,010 kg CO₂e, more than the 762 kg stored: the balance does not return to zero but worsens by 248 kg.

    2. Without module D, reuse wins; with module D, incineration wins. Looking at production and end-of-life alone, reuse is the best scenario, because it avoids combustion emissions. Once module D is added, the ranking reverses: incineration receives a credit for the energy produced, which replaces fossil sources, while reuse only receives credit for the new CLT that is avoided. Adding module D to the result inadvertently rewards the scenario that releases carbon back into the atmosphere immediately.

    3. Reuse receives no credit for the carbon that remains stored in the timber. Even when CLT is reused, EPDs remove the biogenic carbon from the balance in module C3: the value of a second life does not appear in any module. This approach clearly reveals a contradiction and a lack of a regulatory tool to reward it.

    Module D depends on the energy being replaced

    In the main incineration scenarios, module D ranges from −26 to −410 kg CO₂e/m³: it varies by more than fifteen times for the same operation, burning timber at end of life. The difference does not depend on the product, but on which energy source is assumed to be replaced.

    End-of-life_CLT_overall_cycle_D

    Contexts where the electricity grid is highly decarbonized, such as Norway, are “penalized” compared to grids tied to fossil sources, such as Italy’s.

    The overall A1-D cycle

    Adding together production, end-of-life and module D, the ranking reverses. Rubner, which has the highest fossil footprint, becomes the second-best result, at −273 kg CO₂e/m³, thanks to the credit for replaced energy.

    Splitkon and Derix, which instead replace energy that is already renewable or burn only part of the timber, are the only ones with a positive balance.

    End-of-life_CLT_overall_cycle_A1-D

    The chart does not indicate which CLT is better; it simply reports data, which must be carefully evaluated.

    We have seen how the end-of-life scenario adopted and the national energy context can, in fact, favor products with a greater fossil impact on the environment, thanks to incineration and favorable energy conditions.

    Reuse is undervalued

    Under EN 15804, biogenic carbon exits the system at C3 even when the panel is reused: it passes to the next product, which will count it as its own. Reuse retains only the module D credit for the new CLT that does not need to be produced, which is small because producing CLT emits little fossil CO₂.

    In Stora Enso’s EPD, this is worth 46 kg CO₂e/m³, compared to 268 for incineration.

    To give value to reuse, storage time would need to be taken into account: one tonne of CO₂ kept stored in timber for another 50 years is not equivalent to one tonne released back into the atmosphere immediately.

    A method for doing this was proposed in 2024 by Wageningen University & Research, commissioned by the Dutch government: we describe it in Biogenic carbon: why storage time matters.

    The energy credit looks to the past

    Module D assumes that the energy obtained from timber replaces today’s energy mix. But a panel installed today will be demolished in 50 or 100 years, when grids will be far more decarbonized, and the replaced energy will be worth much less. Norway already shows how the calculation changes: with a grid that is almost entirely renewable, Splitkon’s module D is worth −26 kg CO₂e/m³, fifteen times less than Rubner’s.

    With a decarbonized grid, the advantage of incineration shrinks almost to the point of disappearing, and reuse becomes the best scenario even when module D is included.

    What this means for designers

    1. Choose the building’s end-of-life scenario, rather than inheriting the one in the EPD.
    2. Compare products and building systems only under the same end-of-life scenario.
    3. Keep module D separate, stating which replaced energy source it is calculated on and how it would change with a decarbonized grid.
    4. Make reuse credible from the design stage: demountable mechanical connections, identifiable elements, a deconstruction plan. Some manufacturers, such as Derix, already offer panel take-back contracts.

    Want to compare the end-of-life scenarios of your structure?

    We model them explicitly in the LCA analysis of timber buildings, together with the construction details for disassembly in DfMA design.

  • Post-earthquake intervention Emilia: restoration of thin brick vaults

    Post-earthquake intervention Emilia: restoration of thin brick vaults

    Fornale Engineering was responsible for the structural design of the restoration intervention of the thin brick vault floor of a building in the province of Modena affected by the earthquake.

    The intervention was funded by the Emilia Region following the 2012 earthquake and involved the entire building of which this floor is part.

    This is a floor composed of a rectangular grid of 4×3 vaults resting on solid brick pillars.

    The thin brick vaults had been constructed with solid bricks made on site and laid with lime mortar.

    The horizontal thrusts are counteracted by a system of tie rods interrupted at the central pillars, probably due to the excessive lengths the tie rods would have reached.

    The space was once used as a stable and the seismic damage was aggravated by poor maintenance and salts that had impregnated the pillars to the point of making them friable.

    The proposed intervention aimed to restore the structure while maintaining its very interesting structural characteristics and peculiarities.

    MACRO-PHASES OF INTERVENTION for restoration of thin brick vaults

    1. General cleaning, removal of salt efflorescence on pillars, removal of plaster and paint from the intrados of the vaults;
    2. Emptying of the extrados of the vaults;
    3. Cutting along the directrices of the solid bricks of the support arches of the vaults to expose the tie rods and assess their state of degradation;
    4. Complete replacement of tie rods and stakes fixed to the pillars;
    5. Restoration of the grooves along the directrices of the arches;
    6. Cleaning and wetting for the application of a first coat of NHL lime-based mortar, M15;
    7. Installation of aramid mesh on the extrados of the vaults and completion with an additional layer of NHL lime-based mortar, M15;
    8. Leveling of the extrados of the thin brick vaults with expanded clay;
    9. Cement-based grout for regularization of the floor extrados;
    10. Construction of screed and subsequent installation of local clay “pianelle” tiles.

    The completed intervention ensured greater floor rigidity and increased the load-bearing capacity of the floor to ensure it can be used as a warehouse.

    Assignment: Executive structural design

    For more information contact us

  • Seismic Retrofitting of a Building in the Province of Modena

    Seismic Retrofitting of a Building in the Province of Modena

    Fornale Engineering, in collaboration with Eng. Valeria Rizzotti, oversaw the structural design for the seismic retrofitting of the former nursery school in Staggia (MO), damaged by the Emilia earthquake.

    The intervention was complicated by the fact that a significant amount of time elapsed between the earthquake and the start of construction, during which partial collapses occurred, causing further damage to the building.

    We worked on a building with a partially collapsed roof slab, severely damaged underlying floors, masonry damaged by shear failure, widespread lintel failures, and severe cracks in the brick vaults of the staircases.

    SIMPLIFIED LIST OF INTERVENTIONS PERFORMED

    The following interventions were designed and executed:

    • working on the connections between orthogonal masonry piers to create connectivity and ensure their collaboration;
    • reinforcing the timber floors and making the floor plane as rigid as possible (without being able to replace any elements due to frescoed soffits);
    • repairing cracked masonry piers;
    • repairing and consolidating the brick vaults of the staircase;
    • creating the necessary lintels at openings;
    • creating a closing ring beam at the roof slab level (using fibers applied to both faces and tied with tufts);
    • reconstructing the roof slab where it had collapsed and replacing or reinforcing the existing framework where inadequate for current loads.

    The seismic retrofitting intervention was simplified by the particular “compactness” of the building’s floor plan and the presence of well-arranged and well-designed masonry piers.

    In this project, we paid particular attention to floor interventions due to constraints related to the heritage authority and the need to maintain minimum internal clear heights.

    If you are interested in further information on how we retrofitted the floors, please visit the following link.

    Assignment: Structural Co-Design for Seismic Retrofitting

    more information

  • New timber frame residence in Marano – Verona

    New timber frame residence in Marano – Verona

    Fornale Engineering handled the structural design of this timber frame house located in the Valpolicella hills.

    It is a residential unit of approximately 80 sqm in floor plan with an upper-level mezzanine, built using the platform frame system.

    The photos show the early stages of the structure’s construction, which was braced with a single OSB panel (formaldehyde class E1) placed on the exterior side.

    The space between the studs was subsequently filled with insulating material and finished on the interior side with a double layer of plasterboard.

    A windproof membrane was applied to the exterior, followed by 12 cm of wood fiber external insulation with a thin-coat plaster finish.

    The roof slab and the mezzanine were constructed using glulam.

    Assignment: Executive design of timber structures

    more information

  • Seismic consolidation of thin-tile vaults in Modena

    Seismic consolidation of thin-tile vaults in Modena

    The engineering firm Fornale Engineering handled the structural design for the seismic consolidation of the thin-tile vaults following the 2012 Emilia earthquake.

    We managed the structural design of this intervention, which is part of the necessary works for the seismic retrofitting of the entire building.

    The structure has a rectangular plan and features a 4×3 grid of thin-tile vaults with intermediate pillars made of solid bricks prepared on-site.

    Along the axes of the structural grid, there are masonry arches with specific notches to receive the vault bricks, which were laid using lime mortar.

    Steel tie-rods also run along these axes, positioned inside the brick vaults within specific milled grooves. The tie-rods are not continuous but are interrupted at the internal pillars and anchored to a steel post, which is in turn anchored to the pillar.

    Over the years, this structure housed a stable, and the state of mechanical degradation due to salts was compounded by the damage sustained during the 2012 earthquake.

    The intervention we proposed aimed to maintain the grid and structural scheme, restoring and consolidating it wherever necessary.

    MACRO INTERVENTION PHASES: seismic consolidation of thin-tile vaults

    The macro-phases of the intervention are listed below:

    1. General cleaning, removal of saline encrustations and plaster remains from pillars and the intrados of the vaults via dry sandblasting;
    2. Removal of the extrados filling of the vaults;
    3. Milling of the main arches along the axes to verify the state of degradation of the metal tie-rods;
    4. Complete removal of the tie-rods due to their state of preservation;
    5. Installation of new sheathed tie-rods, anchor plates, and tensioning;
    6. Restoration of the milled arches;
    7. Installation of through-running helical bars at the capitals and filling of the haunches with NHL M15 mortar;
    8. Formation of a first layer of NHL M15 mortar on the extrados of the vaults for the subsequent installation of aramid mesh and completion of the structural topping wet-on-wet;
    9. Leveling with expanded clay;
    10. Formation of the screed for the subsequent installation of characteristic terracotta floor tiles;
    11. Finishing of the pillars with plastering.

    The intervention resulted in the seismic consolidation of the vaults and the reinforcement of the floor slab.

    Assignment: Executive structural design

    Please feel free to contact us if you require further information or would like to request a quote.

  • Building Renovation in Verona: Work in Progress

    Building Renovation in Verona: Work in Progress

    Renovation work continues on the building located in Verona, for which the decision was made to remove all existing floors due to their deteriorated condition.

    The structural design of the intervention includes the construction of an internal steel frame integrated with the load-bearing walls, supporting timber floors with the Turrini-Piazza composite system on each level.

    The intervention also included extending the building on the ground floor toward a detached structure, where a bright living area will be created.

    The structural design was accompanied by safety coordination both during the design phase (CSP) and the execution phase (CSE). Work is currently ongoing, and we continue our engagement for the mechanical systems and interior finishing phases.

    Architectural Design and Construction Management: Arch. Nicola Gasperini – Arch. Giovanni Ferrarese

  • Seismic improvement of a historic building in Reggio Emilia

    Seismic improvement of a historic building in Reggio Emilia

    The seismic improvement intervention of a building subject to monumental restrictions in the province of Reggio Emilia has been completed.

    The intervention involved the insertion of new tie rods aimed at preventing out-of-plane overturning mechanisms of the masonry walls caused by the horizontal action of the thin brick vaults (volte in folio) resting on them. Tie rods were installed at the first floor level, while at the second floor, where it was possible to work on the extrados, the vaults were stiffened with a minimally invasive consolidation intervention in addition to the tie rods. The thin brick vaults were stiffened by reconstructing and raising the extrados stiffening ribs (frenelli) and increasing the level of the lateral infill with medium-low density material to avoid overloading the structure. The objective was to shift any potential arch kinematic mechanism upwards. The cracks present along the intersections were first cleaned and subsequently filled with a wedge and structural mortar. Other types of intervention (reinforced concrete jackets or consolidation with carbon fibers on the extrados) were evaluated but deemed unsuitable for the case in question.

    A reinforced curb was constructed at the top of the masonry walls, simultaneously creating the connection with the wooden roof joists.

    Interventions were designed for the roof to reinforce the connections between the wooden elements.

    Assignment: Structural design, Construction management

    more information

  • Structural design of the expansion of a company in Villafranca di Verona

    Structural design of the expansion of a company in Villafranca di Verona

    Fornale Engineering designed the foundation and steel elevation structures for the expansion of the showroom and related residential area on the upper floor of Ottoboni srl in Villafranca di Verona.

    The project is characterized by new inclined glass facades that define the intermediate floor slab made with composite concrete slab and profiled steel sheeting.

    The upper horizontal closure surfaces are made with 2 steel frames positioned at different heights, subsequently clad with Alucobond-type sheeting; the upper canopies are supported on the facade by tubular columns while at the rear they rest on pre-existing structures.

    Assignment: Executive design of steel structures and foundations, fire resistance calculations, fire prevention documentation

    more information

  • Renovation of a Country Villa in the Province of Verona

    Renovation of a Country Villa in the Province of Verona

    Fornale Engineering oversaw the construction management for the renovation of this country villa near Cola di Lazise, Verona.

    The renovation project included:

    • reconstruction of the ground floor slab with the installation of a ventilated crawl space throughout all rooms;
    • replacement of plaster in the lower section of the building with macroporous plaster;
    • complete replacement of electrical and heating systems with the installation of photovoltaic and solar panels on the roof;
    • construction of new wood-steel access stairs to the floors;
    • exterior painting and repair of cracks and crazing;
    • replacement of the rainwater drainage system and external waterproofing of the building perimeter.