DfMA – Designing for Manufacture and Assembly

The construction design of a timber building and the management of production setup require specific knowledge related to:

  • timber-based material technology to define the drilling/milling strategy;
  • management/transfer of data files such as .bvx, .bvn, .btl/bltx through specific software rather than via IFC (imprecise and risky);
  • cutting centre technology and instrumentation;
  • types of transport vehicles and systems best suited for logistics and distances on which to calibrate loading plans;
  • management of installation phases compatible with lifting equipment and systems;
  • water management and handling of details aimed at optimising water control during structural installation.

DfMA is the 3D detailed development of the technical design developed and verified in BIM.

Through the use of BIM, all disciplines are developed throughout the design process and their interferences are evaluated.

Once all potential clashes/interferences have been verified and all disciplines are “frozen”, it is possible to move on to the DfMA construction design.

If you want to understand how we manage the BIM modelling of projects, you can explore the page dedicated to the service.

Drawing on the experience built up over the years and the software at our disposal, we are able to develop projects in CAD/CAM format for any type of timber structure: glulam, CLT and timber frame.

Benefits for clients

The experience and feedback received over the years confirm that having the project engineered and managed by the same person is certainly a winning choice.

For property developers

  • Ability to obtain quotes from multiple suppliers on a fully closed project, with no cost surprises.

  • Full management of production on our side: we liaise directly with the client’s chosen supplier and handle validation before cutting. This allows the developer to delegate production management to us and focus on organising the installation.
  • Working in 3D with dedicated software, we prepare the complete hardware schedule, so the developer simply needs to place the order with their fixings supplier.
  • On-site precision and full correspondence with the approved architectural and structural design.

For suppliers and installers

  • Reduced production lead times, removing the need to liaise with structural engineers who often do not fully develop the timber-side construction details.
  • 3D preparation of machine files for steelwork and direct transmission via TECLA to the cutting centre, with export options compatible with automated laser cutting.
  • Expertise in machine setup for any structural typology: glulam, CLT and timber frame. For frame construction, we are able to develop files for automated production on a tilting table, including automatic OSB panel cutting and automatic nailing.
  • Full responsibility assigned to the studio for all decisions regarding sections and connections.

For design professionals

  • 100% site-ready technical solutions, thanks to our experience in the production of timber structures.
  • Expertise in the management and selection of construction technologies, with a constant focus on constructability that frequently results in material savings and reduced installation time.
  • Confidence for project managers that the construction design is fully compatible with the approved executive design, with no modifications required by contractors or cutting centres.