BIM in timber buildings

We design every timber building in a BIM environment.

For us, the information model is not a tender requirement, but the condition that makes a prefabricated timber structure buildable.

In timber buildings, errors cannot be corrected on site — they must be prevented during the modeling phases.

From the BIM model of timber buildings, we carry the process through to DfMA and CNC production, with continuous control of quantities and costs.

We adopted the BIM modeling approach back in 2017, when Italian regulations began requiring it for public contracts under Ministerial Decree 560/2017 — the “BIM Decree.”

From a tender requirement it became our operational standard: every structural commission originates and lives in the information model.

Why BIM Matters More in Timber

Timber buildings, whether CLT panels or glued laminated timber beams, arrive on site already cut, drilled, and milled with millimeter precision.

The passage of a service through timber structures must be decided and verified months in advance — in the model.

The effects can in fact be both structural in nature and related to fire resistance requirements or acoustic performance or airtightness.

This is why BIM in timber buildings is indispensable; much of its value lies in managing interferences with services, identified and resolved through clash detection before they become a cost on site.

Modifying or correcting a prefabricated timber structure on site is often impossible and entails cost overruns and schedule delays.

How We Manage the Information Process: EIR, Pre-Contract BEP, and BEP

Within our team are dedicated, certified professionals — BIM Specialist Structures — who manage the information process and align our discipline, timber structures, with the requirements of contracting authorities.

In public procurement this dialogue is regulated and follows a precise sequence.

The contracting authority formalizes its requirements in the Employer’s Information Requirements (EIR); during the tender phase we respond with the Pre-Contract BIM Execution Plan (pre-contract BEP); following award, the contractor prepares the BIM Execution Plan (BEP), the operational document governing models, workflows, milestones, roles, and commission verifications.

Our specialists draft and manage the structural portion of the BEP in accordance with the client’s EIR, overseeing its implementation within the Common Data Environment (CDE).

We operate within the framework of sector standards: UNI 11337 for digital management of construction information processes and ISO 19650 at the international level, now referenced by Article 43 and Annex I.9 of the Public Contracts Code.

From BIM Model to DfMA: From Model to Fabrication

For us, BIM is the key step toward DfMA (Design for Manufacturing and Assembly), of which it is the continuation and refinement.

If the information model integrates disciplines and ensures the feasibility of the work, DfMA takes the design one step further, integrating manufacturability and constructability requirements: machining tolerances, selection of element dimensions as a function of load type, assembly logic, and erection sequence.

It is the natural bridge between the model and CNC fabrication of timber elements.

Explore our modeling and DfMA construction-file preparation service.

From BIM Model to Bill of Quantities: From Model to Cost Estimation and Progress Payment Management

BIM is also an economic control tool for us. Thanks to schedules and dedicated software, quantities and therefore project costs update together with the model, directly and rapidly.

The bill of quantities is no longer a separate document, but an extraction from the model itself.

The same method applies on site, where we verify costs related to progress payments (SAL), keeping design, production, and budget aligned throughout the commission.

From BIM Model to LCA Analysis

The BIM model does not only serve construction: it is also the starting point for environmental assessment of the work.

The same quantities we extract from the model — the material schedules, element by element — feed the Life Cycle Assessment (LCA) of the structure.

In timber this link is particularly effective: by taking the model to the detail of the individual element and connections, we obtain an accurate quantity take-off, which makes the impact calculation more robust and verifiable.

LCA operates within the framework of standards UNI EN ISO 14040 and 14044 (principles and method), UNI EN 15978 (building-scale assessment), and EN 15804+A2 (environmental product declarations, EPD), across life-cycle modules A–D.

In public procurement, environmental analysis is required by the Minimum Environmental Criteria (CAM) for construction: D.M. 24 November 2025, implementing Article 57 of the Public Contracts Code (D.Lgs. 36/2023), which from 2 February 2026 replaced the previous D.M. 256/2022 and strengthens the LCA approach in design.

Learn more about our LCA analysis service for timber structures.

When BIM Is Mandatory in Public Procurement

From 1 January 2025, BIM is mandatory for public works contracts exceeding 2 million euros.

The obligation is established by Article 43 and Annex I.9 of the Public Contracts Code (D.Lgs. 36/2023), as amended by the corrective decree D.Lgs. 209/2024, which raised the threshold from the initially planned one million.

It applies to new construction and interventions on existing structures, excluding ordinary and extraordinary maintenance, unless the work was already executed in BIM.

Frequently Asked Questions

When is BIM mandatory in public procurement in Italy?

From 1 January 2025, BIM is mandatory for public works contracts exceeding 2 million euros, pursuant to Article 43 and Annex I.9 of the Public Contracts Code (D.Lgs. 36/2023), as amended by D.Lgs. 209/2024. Ordinary and extraordinary maintenance are excluded.

What is the BIM Execution Plan (BEP)?

The BEP is the operational document that the contractor prepares after award to govern the commission in BIM: models, information workflows, milestones, roles, and verifications. It responds to the contracting authority’s EIR and is governed by standard UNI 11337. It is the evolution of the BIM Execution Plan.

Why is BIM more important in timber structures?

Because timber is prefabricated: cross laminated timber CLT panels and glued laminated timber beams arrive on site already drilled and milled. Every interference with services must be resolved in the model, during design, through clash detection. Unlike concrete, correcting on site is costly and often irreversible.

What is the difference between BIM and DfMA?

BIM integrates disciplines and ensures the work is feasible; DfMA is the next step and integrates manufacturability and constructability — tolerances, dimensioning as a function of loads, erection sequence — up to CNC fabrication. BIM is the model, DfMA translates it into production.

Does BIM allow control of project costs?

Yes. Thanks to schedules and dedicated software, quantities and costs update together with the model, directly and rapidly. On site the same method allows verification of costs related to progress payments (SAL), keeping design, production, and budget aligned.